Gold Line spokesman Habib Balian reports that the formwork for the 210 bridge deck is being completed and concrete will be poured next week. Also, pictures of the bridge team reviewing the materials and sample forms for the decorative baskets on the bridge. Top, Director of Construction, Gary Baker, reviews the sample forms, and below, bridge design concept advisor Andrew Leicester looks over a sample form for the "reeds" that will extend from each basket.
- Brad Haugaard
No comments:
Post a Comment