Gold Line Bridge Construction - Freeway Closure June 18-19


Graphic showing what is happening with the bridge construction.


The Gold Line construction folks expect one closure of the eastbound 210 Freeway on Monday, June 18, from 11 p.m. through 5 a.m. on June 19. The lanes may be partially closed from 10 p.m. through 1 p.m. on the 19th.

- Brad Haugaard

No comments:

Post a Comment