Gold Line Bridge Foundations: Two Down, One to Go


The second Gold Line 210 bridge foundation has been completed. (It took the concrete from 45 trucks - 400 cubic yards.) One more foundation to go. Construction on the third foundation begins Friday, Sept. 30. http://goo.gl/korZg
- Brad Haugaard

No comments:

Post a Comment