~ The internal support structure for the Gold Line 210 bridge superstructure is about done. Gold Line spokesman Habib Balian reports that: "500 tons of reinforcing steel has been installed along the 584-linear-foot structure, and internal walls are now being formed to support the bridge deck. In the coming weeks, 2,100 cubic yards of concrete will be placed within this area."
- Brad Haugaard
No comments:
Post a Comment