News: brad.haugaard@gmail.com   •  Restaurants   •  Library Catalog   •  Library Activities  •  History   •  Facebook / X/Twitter / RSS

Concrete Pouring Begins on 210 Bridge Starting Late Monday

The bridge from the air.

According to Gold Line Extension spokesman Habib Balian, starting late Monday, 2,100 cubic yards of concrete will be placed to form the main outrigger beam and lower half of the superstructure of the 210 Freeway bridge. This will require more than 200 concrete trucks accessing the site over an 18-hour period, and a full closure of the Eastbound 210 Freeway from 11 p.m. Monday night through 5 a.m. Tuesday morning. Here are some more aerial pictures: http://goo.gl/XCh0A
 
Source: Gold Line press release
 
- Brad Haugaard

No comments:

Post a Comment